Once the trenches are filled in, the framing can begin. Here the breezeway floor is being laid out.
The sills are being fitted to the garage area.
The first wall goes up.
...followed by the other walls in the breezeway.
And the walls for the garage.
And finally the last wall and some plywood over everything.